• About
  • Log on
  • Register
  • Contact
  • Home
  • Safety Resources
    • Incident Alerts
    • HiPos Report
    • Guidance
    • Good practice
    • Toolbox talks
    • Hot Topics
    • Other resources
    • Videos
    • Safequarry App
  • The Fatal 6
    • Overview
    • 1. Contact with moving machinery and isolation
    • 2. Workplace transport and pedestrian interface
    • 3. Work at height
    • 4. Workplace Respirable Crystalline Silica
    • 5. Struck by moving or falling object
    • 6. Road traffic accidents
  • Vision Zero
    • Overview
    • Employee Guide
    • Core Values
    • Fatal 6
  • Safer By
    • Overview
    • Safer by competence
    • Safer by association
    • Safer by design
    • Safer by partnership
    • Safer by sharing
    • Safer by Leadership
  • Public Safety
    • Summary
    • Stay Safe
    • Cycle Safe
  • Health & Wellbeing
    • Quarries Partnership - Dust
    • Mental Health & Wellbeing
    • COVID - Safer by Sharing
    • COVID MPA Resources
  • Awards
    • Enter
    • Event
    • Sponsorship
    • Guides
    • Videos
    • Entries
  • News
  • My Information
    • My Saved Files
    • My CPD Report
  • Home
  • Safety Resources
    • Incident Alerts
    • HiPos Report
    • Guidance
    • Good practice
    • Toolbox talks
    • Hot Topics
    • Other resources
    • Videos
    • Safequarry App
  • The Fatal 6
    • Overview
    • 1. Contact with moving machinery and isolation
    • 2. Workplace transport and pedestrian interface
    • 3. Work at height
    • 4. Workplace Respirable Crystalline Silica
    • 5. Struck by moving or falling object
    • 6. Road traffic accidents
  • Vision Zero
    • Overview
    • Employee Guide
    • Core Values
    • Fatal 6
  • Safer By
    • Overview
    • Safer by competence
    • Safer by association
    • Safer by design
    • Safer by partnership
    • Safer by sharing
    • Safer by Leadership
  • Public Safety
    • Summary
    • Stay Safe
    • Cycle Safe
  • Health & Wellbeing
    • Quarries Partnership - Dust
    • Mental Health & Wellbeing
    • COVID - Safer by Sharing
    • COVID MPA Resources
  • Awards
    • Enter
    • Event
    • Sponsorship
    • Guides
    • Videos
    • Entries
  • News
  • My Information
    • My Saved Files
    • My CPD Report

The Health and Safety Hub for the Mineral Products Industry - aggregates, asphalt, cement, concrete, contracting, dimension stone, lime, precast concrete, masonry, mortar, readymix, recycling, silica sand, transport & logistics

  1. Home
  2. BestPracticeView

Good Practice

LOCATION: Asphalt/Coating plant ARTICLE YEAR 2017
ACTIVITY: Production and Processing COMPANY: Aggregate Industries
SUB ACTIVITY: Asphalt & coated stone COMPANY LOCATION: Express Asphalt Design
GOOD PRACTICE No: BP2000 COMPANY TEL: 07802 260584
COUNTRY OF ORIGIN: United Kingdom
TITLE  
Aggregate overflow cut off device
ARTICLE

DESCRIPTION

During asphalt production, when the hot aggregate bins become full, any excess material is expelled through the overflow chute. At Aggregate Industries' Darwen Plant it was usual to remove on average 10 tonnes a day. A large amount of airborne dust was generated by overflow and its removal, creating a significant respirable silica hazard to both customers and operatives. Additionally, this heated aggregate (up to 200°C) could present a burns hazard until it had a chance to cool.

A solution was required that would eliminate the problem altogether rather than just mitigate the risks. Invertech Solutions and the company’s technical department installed a PLC to micro manage this function. Data on flow rates was mapped into an algorithm which calculated how much aggregate was in storage plus what was in transit during production. When a pre-set maximum was reached, the feed would be disabled by the controlling PLC. When room was available in the storage bins the feed would start up again.

BENEFITS

  • Overflow dropped from 10 tonnes per day to just one tonne per month
  • 99.6% reduction in the risk posed by airborne respirable silica
  • 3000 tonnes less aggregate processed unnecessarily
  • Removal of hot aggregate exposure risk and associated fumes
  • Reduced maintenance requirement due to less processing through the asphalt plant
  • Annual savings from 1,400 less loading shovel movements
  • Savings in fuel burned and emissions
  • Reduced risk of collisions on congested site
  • Three month pay back on investment that can be easily adapted for other plants
  • Safer working environment for everyone on-site.
ARTICLE IMAGES
Click image to enlarge

Click image to enlarge

Request Futher Information
pdf document available
Go back to search critera
About
Mineral Products Association, 1st Floor, 297 Euston Road, London NW1 3AD
Tel: 0203 978 3400
Email: info@mineralproducts.org
MPA Logo
Contact
  • Privacy
  • Developed by OFEC
↑