CYLINDER FAILURE CAT 775 DUMPER 
        
    
    
    
        ACTIVITY:
        PRODUCTION AND PROCESSING
     
    
        SUB ACTIVITY:
        CEMENT PRODUCTION
     
 
         
    
        TITLE
        CYLINDER FAILURE CAT 775 DUMPER
        COUNTRY OF ORIGIN
        
     
    
        
            
WHAT HAPPENED
        
        The operator of a Cat 775D dump truck reversed into the primary crusher reception hopper area to discharge the load of blasted rock into the crusher. As the operator started to raise the skip body, he noticed the truck lurch to one side. 
He stopped the operation and checked to see if he had reversed onto a rock. While checking, he noticed that the off side hydraulic lift cylinder had come off its bottom mounting and was positioned between the inside rear wheel and chassis. The bottom cylinder mounting bearing had disintegrated and allowed the cylinder to come away. On inspection the bearing was found to be dry and the grease line blocked. All other similar bearings were checked and all showed signs of wear/crack, although no lubrication problems were found.
     
    
    ACCIDENT / INCIDENT IMAGES
    
        Click image to enlarge
        
         CAT Picture 1
        
        CAT Picture 1
     
    
        Click image to enlarge
        
         CAT Picture 2
        
        CAT Picture 2
     
 
 
LEARNING POINTS / ACTIONS TAKEN
  
Lack of lubrication: Inspect lubrication system at every 250 hour maintenance check. Check auto lube system daily to ensure adequate lubrication is being used.
Lack of inspection: Remove bearing end cap and carry out thorough inspection at every 250 hour maintenance check.
Manufacturers guidelines for inspection: Cat maintenance check does not include bearing end cap removal at 250 hours. CAT informed of corrective measures.
Checks carried out at another works have shown that the same bearings were cracked and they have been subsequently changed.
 
    