• About
  • Log on
  • Register
  • Contact
  • Home
  • Safety Resources
    • Incident Alerts
    • HiPos Report
    • Guidance
    • Good practice
    • Toolbox talks
    • Hot Topics
    • Other resources
    • Videos
    • Safequarry App
  • The Fatal 6
    • Overview
    • 1. Contact with moving machinery and isolation
    • 2. Workplace transport and pedestrian interface
    • 3. Work at height
    • 4. Workplace Respirable Crystalline Silica
    • 5. Struck by moving or falling object
    • 6. Road traffic accidents
  • Vision Zero
    • Overview
    • Employee Guide
    • Core Values
    • Fatal 6
  • Safer By
    • Overview
    • Safer by competence
    • Safer by association
    • Safer by design
    • Safer by partnership
    • Safer by sharing
    • Safer by Leadership
  • Public Safety
    • Summary
    • Stay Safe
    • Cycle Safe
  • Health & Wellbeing
    • Quarries Partnership - Dust
    • Mental Health & Wellbeing
    • COVID - Safer by Sharing
    • COVID MPA Resources
  • Awards
    • Enter
    • Event
    • Sponsorship
    • Guides
    • Videos
    • Entries
  • News
  • My Information
    • My Saved Files
    • My CPD Report
  • Home
  • Safety Resources
    • Incident Alerts
    • HiPos Report
    • Guidance
    • Good practice
    • Toolbox talks
    • Hot Topics
    • Other resources
    • Videos
    • Safequarry App
  • The Fatal 6
    • Overview
    • 1. Contact with moving machinery and isolation
    • 2. Workplace transport and pedestrian interface
    • 3. Work at height
    • 4. Workplace Respirable Crystalline Silica
    • 5. Struck by moving or falling object
    • 6. Road traffic accidents
  • Vision Zero
    • Overview
    • Employee Guide
    • Core Values
    • Fatal 6
  • Safer By
    • Overview
    • Safer by competence
    • Safer by association
    • Safer by design
    • Safer by partnership
    • Safer by sharing
    • Safer by Leadership
  • Public Safety
    • Summary
    • Stay Safe
    • Cycle Safe
  • Health & Wellbeing
    • Quarries Partnership - Dust
    • Mental Health & Wellbeing
    • COVID - Safer by Sharing
    • COVID MPA Resources
  • Awards
    • Enter
    • Event
    • Sponsorship
    • Guides
    • Videos
    • Entries
  • News
  • My Information
    • My Saved Files
    • My CPD Report

The Health and Safety Hub for the Mineral Products Industry - aggregates, asphalt, cement, concrete, contracting, dimension stone, lime, precast concrete, masonry, mortar, readymix, recycling, silica sand, transport & logistics

  1. Home
  2. IncidentReports
  3. IncidentView

Hotwork - RMC Fire

LOCATION:
OTHER
ACTIVITY:
PRODUCTION AND PROCESSING
SUB ACTIVITY:
AGGREGATE PROCESSING
ALERT STATUS:
Normal
DATE ISSUED:
24/07/2006
INCIDENT No:
00079

TITLE
Hotwork - RMC Fire
COUNTRY OF ORIGIN

WHAT HAPPENED

The fire started when Linatex lined pipe-work was ignited during hot work. Heat from Arc Welding ignited the Linatex lining and the pipes design meant that the lining sparked and continued combustion at such a rate, (fed by the suction of air, as in a chimney), that it soon spread.

Once it had spread to the Screens and the conveyors, it became impossible to stop.

When Linatex ignites, it is near impossible to extinguish and will migrate through the lined areas of the plant. With this in mind, ALL managers must review their hot work procedure when working on or near Linatex.

This should be a reminder to everyone of the need for sufficient Risk Assessments/SWP's and adequate Fire Points when undertaking hot work.
ACCIDENT / INCIDENT IMAGES
Click image to enlarge

Pictured above the recent fire at an RMC Sand and Gravel Wharf.


LEARNING POINTS / ACTIONS TAKEN

Some points to consider in your review:

• Don’t just have a standby fire procedure, constantly damp down any lined areas around the hot working area.

• Insist that the isolation and lock off procedures are followed. (You may then be left with the problem that you can’t have pumps running, to water down the aforementioned areas. Consider hiring a small engine driven pump to be used whilst the plant is isolated.)

• Insist on a 30minute fire-watch after the works are complete.

• Ensure you have suitable communications in place to carry out the emergency procedures

• Ensure all persons undertaking hot work are trained and competent
LEARNING POINTS / ACTIONS IMAGES


LOCATION:
OTHER
ACTIVITY:
PRODUCTION AND PROCESSING
SUB ACTIVITY:
AGGREGATE PROCESSING
ALERT STATUS:
Normal
DATE ISSUED:
24/07/2006
INCIDENT No:
00079


Request Futher Information
Print Page
convert this page to a pdf
Go Back to Search Critera

About
Mineral Products Association, 1st Floor, 297 Euston Road, London NW1 3AD
Tel: 0203 978 3400
Email: info@mineralproducts.org
MPA Logo
Contact
  • Privacy
  • Developed by OFEC
↑