Best Practice

LOCATION: Readymix or mortar plant ARTICLE YEAR 2009
ACTIVITY: Manual handling and storage COMPANY: Tarmac
SUB ACTIVITY: N/A COMPANY LOCATION: Retford Concrete Plant
BEST PRACTICE No: BP657 COMPANY TEL: 01777 713506
COUNTRY OF ORIGIN: United Kingdom
TITLE  
Mixer chute electric winch system
ARTICLE
Retford Concrete Plant produces concrete through a Miller’s mixer, discharging
through a chute into a mixer truck.

The chute is suspended below the mixer by a frame and must be lowered to ground level for maintenance or cleaning two to three times a day.

The only access to clean the chute was through the mixer door necessitating the chute to be lowered using a scaffold tower. The chute’s securing bolts then had to be removed and a block and tackle used to secure the chute. This was very time consuming and required substantial manual handling.

A modification was carried out to enable the chute to be lowered using a winch and bearings attached to the frame.

The operator now releases the frame by unscrewing two securing nuts and then
pressing a button to lower the chute.
ARTICLE IMAGES
Click image to enlarge



pdf document available
Go back to search critera